A 12-week protocol designed to build strength and running capacity simultaneously.

 

The Structure:

  • Weeks 1–8: Base Building (Engine + Armor).
  • Weeks 9–12: The Peak (Pick 5k or Mile Focus).  

Flexible Standards:

Includes 2 and 3-day lifting options to fit your schedule.

 

Opening January 2026.

 

 

Join the list below for early access and a discount.